Case Studies

Bombardier EFW, Belfast

Taranto installed over 1200No 275mm2 & 350mm2 driven pre-cast concrete piles for a new waste to energy plant for Main Contractor John Sisk & Sons.

Read Case Study

Sainsbury Food Store & Supermarket, Middlesbrough

Taranto installed 235,275 & 350mm2 pre-cast concrete piles for a new Sainsbury food store and supermarket for Main Contactor, Barr Construction.

Read Case Study

Athlone Art Gallery

Construction works at the new Athlone Art Gallery consisted of the renovation of a derelict 18th Century riverside warehouse plus the construction of a new build extension to the existing warehouse. Both new and old structures are located adjacent to the quay side of the river Shannon in the centre of Athlone.

Read Case Study

Ringaskiddy Harbour

Taranto Ltd played a key role in the construction of a new 110,000 sq. ft. grain store in Ringaskiddy Harbour for Ireland's €8 billion agri food sector. Main contractor Bam Contractors awarded the piling and pile testing element of the above mentioned works to Taranto Ltd.

Read Case Study

Freightliner Development, Dagenham, Hope Construction Materials

Taranto installed 275mm2 fully reinforced pre-cast concrete piles for a new Railside bagging and loading plant for Main Contactor, Toureen Group Ltd.

Read Case Study

Housing Development Comber Road, Newtownards

Taranto have design, manufactured and installed the foundation package for the 56 housing sites at the new housing development at Comber Road, Newtownards for Braidwater Homes.

Read Case Study

North Foreshore Film Studio

Taranto have design, manufactured and installed the driven pre cast concrete piled foundations for the new North Foreshore Film Studios in Belfast.

Read Case Study

South Queensferry Scotland

Taranto have designed, manufactured and installed its Foundation Package system at the redevelopment of South Queensferry Scotland; for Bellway Homes.

Read Case Study

Fernhill, Glasgow

Taranto have design, manufactured and installed its Foundation Package system at the redevelopment of Fernhill, Glasgow; for Main Contractor Crudens Construction Ltd.

Read Case Study

Lawnbrook Redevelopment, Belfast

Construction on the brownfield site, included piled foundations to depths up to 10m using pre-cast concrete driven piles and also tubular steel driven piles.

Read Case Study

Ormeau Road

In keeping with the first two phases of the Clanmill Housing Association development at Ormeau Road, Belfast, Phase Three also required piled foundations to be installed with the minimum of noise and vibration or disturbance to the local residences.

Read Case Study

Castlewellan Road

Taranto Ltd was employed by main contractor O'Hare & McGovern to design, manufacture and installed a precast foundation system on a large social housing scheme in Newcastle, Co Down. The scheme consisted of 130no houses, including 4no apartment blocks.

Read Case Study

Ravenhill Road, Belfast

Main contractor O'Hanlon & Farrell asked Taranto Ltd to provide a Foundation Package for the construction of 67 No new terrace, semi-detached and duplex dwellings being built by social housing developer Apex.

Read Case Study

Glen Community Centre

Taranto supplied a fully engineered Foundation package for the Glen Community Centre, Belfast for Main Contactor, Glasgiven Contracts.

Read Case Study

Warehouse at Wednesbury, Birmingham

The Kingpost system is comprised of vertical steel columns placed at pre-drilled positions, with pre-cast concrete panels spanning between.

Read Case Study

Fernhill Kingpost Wall

The Kingpost system is comprised of vertical steel columns placed at pre-drilled positions, with pre-cast concrete panels spanning between.

Read Case Study

Ravenhill Stadium Belfast

Taranto have design, manufactured and installed the pre-cast terracing units, vomitory wall and stair units at the redeveloped Ravenhill Stadium Belfast, for Main Contractor Gilbert Ash.

Read Case Study

Warehouse Extension Runcorn

Taranto have design, manufactured and installed the pre-cast concrete wall panels & pre-cast concrete driven piles to the extension to a storage facility at Runcorn, for Main Contractor TSL Projects.

Read Case Study

Meteor Retail Park, Bournemouth

Taranto have design, manufactured and installed the pre-cast concrete wall panels to the new retail development at Meteor Retail Park Bournemouth, for Main Contractor Gilbert Ash.

Read Case Study

Windsor Park Stadium Redevelopment, Belfast

Taranto have design, manufactured and installed the new pre-cast terracing, stairs and vomitory wall at the redeveloped Windsor Park Stadium, for Main Contactor O'Hare & McGovern.

Read Case Study