Case Study

Pre-cast

Project:

Fernhill, Glasgow

Main Contractor:

Crudens Construction Ltd

Client:

South Lanarkshire Council

Project Engineer:

Harley Haddon Consulting Engineers

Product:

Foundation Packages

Project details

Taranto have design, manufactured and installed its Foundation Package system at the redevelopment of Fernhill, Glasgow; for Main Contractor Crudens Construction Ltd.

Construction on the brownfield site, included piled foundations to depths up to 10m using pre-cast concrete driven piles and also tubular steel driven piles. Foundations for the 28No new build social houses was provided by Taranto’s pre-cast ground beam and structural flooring system.