Taranto have design, manufactured and installed the foundation package for the 56 housing sites at the new housing development at Comber Road, Newtownards for Braidwater Homes.

The Foundation Package system comprises of 280 No pre-cast concrete piles installed to depths of 18m, 1700 lm of ground beam & 2500m² of structural flooring.